Studio project 5

Long time no see – but we’re finally getting somewhere compared to my last update. Sept. 12th the last windows went up, in between rains. In the meantime I’ve been slowly putting up insulation, plastic, boards and lately some of the drywall. This room is going to shine compared to the darkness of before! (and those photos were done on a sunny day + optimized for clear viewing)

Continue reading “Studio project 5”

Studio project 4

All building has been suspended while waiting for weather and help installing the skylights, as well as resting my back after multiple treatments to help with the nerve pain in my leg. (what looks like windows in my previous photos are just semitransparent roof plates)

Roof plates have to be removed and cut, so it didn’t make sense to put up insulation, and I was beginning to worry we’d have to postpone until spring while I was trapped in the kitchen going bonkers. 😉 (perfect time to get those novels off my chest some would say, but it’s been more than 30 years since I thought I had any in me, so that’s hardly an option although it would have been fun!)

Continue reading “Studio project 4”

Studio project 3

Ready for electrician to distribute wires in the 3 new wall skeletons, then we can begin putting up insulation and plaster boards up to where the windows go in.

= no more hay dust or risk of cat pee (not my cats, the occasional stray) in this section of the loft when that and the top triangle wall are done. Plenty of saw dust everywhere however, so I won’t be able to move in with my stuff until the 4th wall has a skeleton too, at the earliest.

Continue reading “Studio project 3”

Studio project 2

“My eyes are poor. My ears are gnarled. My legs are old and bent.” *

First wall of three has been prepared. I can hardly move or stand upright, but I’ll have to try to fix that later, since my chiro hasn’t been able. Today after a trip to the lumber yard, we’ll begin tackling the other side, tomorrow Continue reading “Studio project 2”

Studio project 1

Half a hayloft. Slow going, but it’s this, NOW, or I go nuts. I really need to be able to choose my quiet times to be able to work, not wait for it to be granted.

Clearing, cleaning, more cleaning, lots of cleaning, then starting with those candy cane bales of insulation that you can spot in the back.

hayloftstudio01

Continue reading “Studio project 1”